Home | FAQ | Links | Contact Us My CommuterLink Alerts
You are here: Skip Navigation Links Home > Construction
ImpactDetailsCountyStart DateEnd Date
HighI-15 EXPRESSLink Construction Roadway Reconstruction I-15 reconstruction and widening. SB I-15 at 2300 N and 900 W entrance and exit ramps closed. Traffic switched to NB lanes with reversible lanes to favor peak traffic times All traffic shifts to east side of freeway. Expect I-15 closures to accommodate Bridge replacements Davis1/3/2009 12:00:00 AM11/30/2009 11:59:00 PM
Medium10400 So Road Widening Construction New Construction Road Widening to two lanes each direction. Sidewalks, curb and gutter, dedicated turn lanes and upgraded traffic signals. Speed limit reduced to 25 mph even in areas with new concrete. Salt Lake8/1/2008 8:00:00 AM11/15/2009 5:00:00 PM
MediumUS 6 Near White River Construction New Construction White River to MP 219 widening road to five lanes. One lane in each direction. Speed limit lowered 10 mph. Minimal delays Utah9/30/2008 12:00:00 AM12/30/2009 11:59:00 PM
MediumSyracuse Road Antelope Drive Construction New Construction between 1000 and 2000 WestUtility work in preparation for road widening. Restricted to 1 lane with flaggers. Davis6/3/2009 7:30:00 PM11/30/2009 6:00:00 AM
Medium11400 South Interchange Construction Roadway Reconstruction New interchange and road construction and road widening at 11400 South connecting to I-15 and wideniing from State Street to Bangerter Highway. Salt Lake3/3/2009 12:00:00 AM11/3/2010 11:59:00 PM
MediumSR 201 Widening Construction New Construction SR 201 is closed at SR 202 and I-80 for widening project. Alternate route is SR 202. Salt Lake7/29/2009 12:00:00 AM11/16/2009 11:59:00 PM
MediumSR 77 Springville Road and bridge reconstruction Construction Bridge Work from 1750 West to Main Street closed until November. I-15 restricted to two lanes in each direction Utah8/3/2009 7:00:00 AM11/30/2009 6:00:00 PM
Medium11400 South widening and Construction New Construction between State Street and Bangerter Hwy. Watch for flagging and intermittent closures along the project route Salt Lake1/1/2009 12:00:00 AM9/30/2010 11:59:00 PM
Low3500 S Road Widening Construction Roadway Reconstruction Road widening with utility relocations. Traffic routed to middle of roadway. Reversible lanes in work zone will allow 2 travel lanes EB and 1 WB 5 am to 1 pm and 2 WB and 1 EB 2 pm to 10 pm. Left turns at signalized intersections only. Salt Lake1/3/2009 9:00:00 AM7/30/2010 5:00:00 PM
LowUS 6 Diamond Fork Road Improvements Construction Bridge Work Installing pipeline at Diamond Fork and bridge replacement at Tucker Rest area will restrict traffic to 1 lane in each direction with reduced speed limit. Utah1/3/2009 12:00:00 AM12/30/2009 11:59:00 PM
LowGrand County US-191 Construction Bridge Work Preparing staging area and assembling equipment for Storm drain pipe installation. Grand3/10/2009 12:00:00 AM11/30/2009 11:59:00 PM
LowI-15 Washington to Cottonwood Creek Construction Bridge Work repairing overpass beams and paraput ends. Expect minimal delays merges to 1 lane north of Hurricane exit. Washington4/6/2009 12:00:00 AM11/6/2009 11:59:00 PM
  Page of 4   Next   Last
* Click on a column name to sort the data by that column. Click on the same column a second time to reverse the order.
The "Impact" column grades the traffic flow disruption due to construction, based on UDOT's criteria, as follows:
High = over 15 min delay Medium = 5-15 min delay
Low = 0 - 5 min delay Unknown = unknown delay
Incidents +/-
National Weather Service Forecast +/-
© 2009 UDOT CommuterLink