| High | I-15 EXPRESSLink
Construction
Roadway Reconstruction
I-15 reconstruction and widening. SB I-15 at 2300 N and 900 W entrance and exit ramps closed. Traffic switched to NB lanes with reversible lanes to favor peak traffic times All traffic shifts to east side of freeway. Expect I-15 closures to accommodate Bridge replacements
| Davis | 1/3/2009 12:00:00 AM | 11/30/2009 11:59:00 PM |
| Medium | 10400 So Road Widening
Construction
New Construction
Road Widening to two lanes each direction. Sidewalks, curb and gutter, dedicated turn lanes and upgraded traffic signals. Speed limit reduced to 25 mph even in areas with new concrete.
| Salt Lake | 8/1/2008 8:00:00 AM | 11/15/2009 5:00:00 PM |
| Medium | US 6 Near White River
Construction
New Construction
White River to MP 219 widening road to five lanes. One lane in each direction. Speed limit lowered 10 mph. Minimal delays
| Utah | 9/30/2008 12:00:00 AM | 12/30/2009 11:59:00 PM |
| Medium | Syracuse Road Antelope Drive
Construction
New Construction
between 1000 and 2000 WestUtility work in preparation for road widening. Restricted to 1 lane with flaggers.
| Davis | 6/3/2009 7:30:00 PM | 11/30/2009 6:00:00 AM |
| Medium | 11400 South Interchange
Construction
Roadway Reconstruction
New interchange and road construction and road widening at 11400 South connecting to I-15 and wideniing from State Street to Bangerter Highway.
| Salt Lake | 3/3/2009 12:00:00 AM | 11/3/2010 11:59:00 PM |
| Medium | SR 201 Widening
Construction
New Construction
SR 201 is closed at SR 202 and I-80 for widening project. Alternate route is SR 202.
| Salt Lake | 7/29/2009 12:00:00 AM | 11/16/2009 11:59:00 PM |
| Medium | SR 77 Springville Road and bridge reconstruction
Construction
Bridge Work
from 1750 West to Main Street closed until November. I-15 restricted to two lanes in each direction
| Utah | 8/3/2009 7:00:00 AM | 11/30/2009 6:00:00 PM |
| Medium | 11400 South widening and
Construction
New Construction
between State Street and Bangerter Hwy. Watch for flagging and intermittent closures along the project route
| Salt Lake | 1/1/2009 12:00:00 AM | 9/30/2010 11:59:00 PM |
| Low | 3500 S Road Widening
Construction
Roadway Reconstruction
Road widening with utility relocations. Traffic routed to middle of roadway. Reversible lanes in work zone will allow 2 travel lanes EB and 1 WB 5 am to 1 pm and 2 WB and 1 EB 2 pm to 10 pm. Left turns at signalized intersections only.
| Salt Lake | 1/3/2009 9:00:00 AM | 7/30/2010 5:00:00 PM |
| Low | US 6 Diamond Fork Road Improvements
Construction
Bridge Work
Installing pipeline at Diamond Fork and bridge replacement at Tucker Rest area will restrict traffic to 1 lane in each direction with reduced speed limit.
| Utah | 1/3/2009 12:00:00 AM | 12/30/2009 11:59:00 PM |
| Low | Grand County US-191
Construction
Bridge Work
Preparing staging area and assembling equipment for Storm drain pipe installation.
| Grand | 3/10/2009 12:00:00 AM | 11/30/2009 11:59:00 PM |
| Low | I-15 Washington to Cottonwood Creek
Construction
Bridge Work
repairing overpass beams and paraput ends. Expect minimal delays merges to 1 lane north of Hurricane exit.
| Washington | 4/6/2009 12:00:00 AM | 11/6/2009 11:59:00 PM |
|
Page
of
4
Next
Last
|